Well installers turned up today, was a bit of a joke. first the racking would not fit our roof profile. even though I asked the site inspection guy to go on the roof when he was here.
Then the Victron stuff they got out diid not fit in the switchboard I had provided, had to show them how to fit the 3 inverters and solar reg iside the box.
Starting to wonder if they had doae any 3 phase systems ?
Went inside for a bit and when I came back the 6 battery cables were different lengths, said "different resistance" and was told, well I thought about it and as each inverter will be doing its own thing on each phase it will not be a problem !!!!!!!!!!!!!!!!
Bit my tongue, ordered some 70mm cable, guess what will be changed out as soon as they are finished ?
Then told me they will be in Melbourne for next week, will finish system sometime !
If it wasn't for the knee replacement I should have done myself !!!!
Solar 3 phase system install
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Solar 3 phase system install
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !
Suzuki GV more than ready to go NOW !
-
- Posts: 15962
- Joined: Fri Nov 23, 2012 3:44 pm
- Location: Mannum South Australia by the beautiful Murray River
- Has thanked: 50 times
- Been thanked: 30 times
Re: Solar 3 phase system install
I'm assuming it's a 48v system, all three inverters have to run off the one battery pack and depending whether you are running single phase off each inverter into its own section of the house wiring, the inverters will run at different battery demand levels, but if it's just 3 phase, they will all run exactly the same .... certainly sounds like they are not very experience in what they are trying to set up.
What battery are you using?
T1 Terry
What battery are you using?
T1 Terry
A person may fail many times, they only become a failure when they blame someone else John Burrows
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Re: Solar 3 phase system install
3 phase system throught the whole place, including to house switchboard, even elec oven and stovetop are on different phases. We also have a commercial LPG oven/range in the entertainment area, so if the elec oven demand is too much can use that. Other than that, apart from a few pieces of equipment like quillotene is basically single phase, spread over the 3 phases. Not grid connected at this stage, I do have a brainy sparky on tap who could not do this system for this price, but is willing to see if we can corrupt it to grid connect if I decide to.
So just a changeover switch, grid or off grid system to feed everything.
I believe we have sufficient power for the 2 of us, with a simple switch to the grid for times of extreme usage. The only reason I would bother with grid connect is to get a trickle of money to cover the service fee, that would be sweet justice I think. I Qld poles and wires are still owned by anna so no avoiding the service charge.
Battery is 32 x 200 Ah Winston, giving 400 Ah at 48 volt. This pack should outlast me.
Guy coming to look at VP next week, I feel all that double clutching may be too much for my left knee replacement
So just a changeover switch, grid or off grid system to feed everything.
I believe we have sufficient power for the 2 of us, with a simple switch to the grid for times of extreme usage. The only reason I would bother with grid connect is to get a trickle of money to cover the service fee, that would be sweet justice I think. I Qld poles and wires are still owned by anna so no avoiding the service charge.
Battery is 32 x 200 Ah Winston, giving 400 Ah at 48 volt. This pack should outlast me.
Guy coming to look at VP next week, I feel all that double clutching may be too much for my left knee replacement
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !
Suzuki GV more than ready to go NOW !
-
- Posts: 15962
- Joined: Fri Nov 23, 2012 3:44 pm
- Location: Mannum South Australia by the beautiful Murray River
- Has thanked: 50 times
- Been thanked: 30 times
Re: Solar 3 phase system install
As in selling it, or converting it to 8 sp auto or one of the Allison electric transmissions that give you something like 60 different engine/electric ratios to give the performance and economy depending on how heavy the right foot getsBusman wrote: ↑Mon Oct 23, 2023 6:42 pm 3 phase system throught the whole place, including to house switchboard, even elec oven and stovetop are on different phases. We also have a commercial LPG oven/range in the entertainment area, so if the elec oven demand is too much can use that. Other than that, apart from a few pieces of equipment like quillotene is basically single phase, spread over the 3 phases. Not grid connected at this stage, I do have a brainy sparky on tap who could not do this system for this price, but is willing to see if we can corrupt it to grid connect if I decide to.
So just a changeover switch, grid or off grid system to feed everything.
I believe we have sufficient power for the 2 of us, with a simple switch to the grid for times of extreme usage. The only reason I would bother with grid connect is to get a trickle of money to cover the service fee, that would be sweet justice I think. I Qld poles and wires are still owned by anna so no avoiding the service charge.
Battery is 32 x 200 Ah Winston, giving 400 Ah at 48 volt. This pack should outlast me.
Guy coming to look at VP next week, I feel all that double clutching may be too much for my left knee replacement

you'd end up with the ultimate motorhome power plant, recharge from solar or plug in or run on fuel and regen battery capacity to reduce brake servicing and overheat problems along with far cheaper fuel bills ... all in a fully automatic gearbox, no more clutch and gear changes ....
T1 Terry
A person may fail many times, they only become a failure when they blame someone else John Burrows
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Re: Solar 3 phase system install
Done 4 years on her to get to this stage T1, I don't have enough left in me to do anything else, will hire or downsize if we want to go somewhere. Anyway he might not buy her, but was keen enough to drive from perth !
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !
Suzuki GV more than ready to go NOW !
-
- Posts: 15962
- Joined: Fri Nov 23, 2012 3:44 pm
- Location: Mannum South Australia by the beautiful Murray River
- Has thanked: 50 times
- Been thanked: 30 times
Re: Solar 3 phase system install
That's dedication to a purchase

T1 Terry
A person may fail many times, they only become a failure when they blame someone else John Burrows
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
Those who struggle to become a leader, rarely know a clear direction forward for anyone but themselves
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Re: Solar 3 phase system install
150 K is price on her, if I spend lots of time after vintage would be looking for closer to 200 but 150 will do for now, he is happy with that.
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !
Suzuki GV more than ready to go NOW !
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Re: Solar 3 phase system install
Turned out to be a serial looker, gave them 3 days of my time and at the end of the third day they transferred 10K deposit, said they were moving in next day, and could only get 5K a day from their banks. Thought about it overnight and decided that was not acceptable but when they arrived they had changed mind and wanted deposit back. Said they woul have left some on the table for my trouble but was so disgusted just wanted to see the last of them.Should have been alerted when they told me about all the buses they had looked at on the way over.
Seems wife was going along with hubbie bus dream but always found something wrong so did not buy. As soon as they could not find anything wrong with VP (apart from being too complex) and he put a deposit on, she took him back to motel room and got that decision reversed. Would have been good to be a fly on the wall to see what she did to get his mind change !!!!!!!!
Seems wife was going along with hubbie bus dream but always found something wrong so did not buy. As soon as they could not find anything wrong with VP (apart from being too complex) and he put a deposit on, she took him back to motel room and got that decision reversed. Would have been good to be a fly on the wall to see what she did to get his mind change !!!!!!!!
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !
Suzuki GV more than ready to go NOW !
-
- Posts: 9025
- Joined: Tue Dec 04, 2012 4:16 pm
- Location: Rutherglen, Vic.
- Has thanked: 28 times
- Been thanked: 61 times
Re: Solar 3 phase system install
Would have been good to be a fly on the wall to see what she did to get his mind change !!!!!!!!
An AVO in the wings, maybe?


Regards & God bless,
Ray
--
"Insufficient data for a meaningful answer."
Isaac Asimov, "The Last Question"
"I refuse to drink water, because of the disgusting things fish do in it"
W.C.Fields
Ray
--
"Insufficient data for a meaningful answer."
Isaac Asimov, "The Last Question"
"I refuse to drink water, because of the disgusting things fish do in it"
W.C.Fields
-
- Posts: 1261
- Joined: Wed Dec 05, 2012 10:09 pm
- Location: Stanthorpe QLD
- Has thanked: 1 time
- Been thanked: 2 times
Re: Solar 3 phase system install
Well getting happier with the system, we are using a Heltec balancer and it is able to keep any cell disparity to about 10 Mv, while putting 100 amps into the battery, uses a capitator system so no outside power required. Took a bit of juggling to get the slower cells to catch up but all in line now. Tonight will be first on battery power so it will be interesting to see how much we use of the 20 Kw available. Only concern is how much is used by the three inverters and the solar regulator overnight,
Vanishing Point, almost ready to vanish
Suzuki GV more than ready to go NOW !